Josep Pallach street urbanization

Josep Pallach street urbanization

Viladecans, Baix Llobregat

Location
Viladecans, Baix Llobregat
Finalization date
2014
Urbanized surface
2.910 m2

Josep Pallach's street is an old axis that followed the old Torrent de Can Tirus, a stream that has been channeled and moved to the adjacent parallel streets. The old axis didn't fit the urban plan and throughout the years, as the city grew, the street ended being disconnected from the main urban structure.

This project's main objective is to connect the Josep Pallach's street to the main structure in order to complete an existing structural axis spanning form the Orquídies street to the Lluís Companys street, in Viladecans.

The urban project includes a new playground, where the buildings used to stand aligned with the Canonge Doctor Auguet street, that functions as a node that allows to connect the old axis with the new one with a public space that facilitates their communication.